Riverwalk bicycle safety
Fast-moving e-bikes on the Riverwalk remain a concern, but staff say an outright ban would be hard to enforce and legally shaky. Instead, the city is installing reflective share-the-path signs and working with police on education — with a ban kept on the table if problems continue.
Regional Library Sharing Expanded
Astoria cardholders can now borrow directly from Seaside and Warrenton libraries — holds arrive in one to two weeks, or you can just drive over. Non-residents outside the three cities still pay $70 a year, and councilor Davis pushed for pursuing countywide service.
Riverwalk lighting extension to Upper Town
The council approved buying 40 solar bollard lights to extend Riverwalk lighting from 35th Street toward the LaPlante Spur — a long-awaited fix for Upper Town at roughly half the cost of wired lights.
17th Street floating dock replacement
The old dock is closed because it's unsafe; repairs were running near $50,000 a year. A new, sturdier dock will cost about $429,000 total.
Astoria Column 100th Anniversary Celebration
The Column turns 100 with a free community party at Heritage Square and a rededication ceremony on July 18, plus a York interpretive panel unveiling July 1.
Temporary art display application — Paul Soriano
Local artists, schools, and community groups can now show artwork in designated library spaces under a new policy. Displays are capped at about three months, must be approved by the Library Director, and can't include graphic violence, explicit imagery, or election campaign material.
Evergreen Field improvements grant
The board endorsed pursuing a state grant to add a second ball field at upper Evergreen Fields — a big win for softball and T-ball programs — plus picnic shelters, a small play structure for younger siblings, path resurfacing, and restroom renovations. School district leaders wrote letters of support.
Marine railway deterioration near the Memorial
Committee members worry the old marine railway northwest of the Memorial is degrading from tides and weather. It sits on Port property, so they're considering asking the Port — and Bergerson Construction for a quote — to help shore it up.
Wayfinding for finding names on the memorial
Englund Marine wants to buy a full panel (about $7,000) to honor its eight founders and its 80-plus years supporting Astoria's maritime community. The committee likes the idea and a final proposal comes back next meeting.
Astoria Public Library Renovation Costs Rising
The library renovation contract grew by another $75,800 as the council approved Amendment No. 7, pushing the guaranteed maximum price to nearly $8.45 million on the 2022 bond project.
New library community reception
Board members report strong positive feedback about the new library building, including its artwork, tutoring space, and meeting rooms. The Library of Things is progressing slowly due to staffing shortages but remains a priority.
Astoria Column parking fee increase proposal
The annual Column parking pass doubles to $10, with a $5 rate in December and January. The city's cut rises to $2 per pass, and roughly $1.5 million in future restoration work is anticipated.
Bumble Childcare sewage pump emergency
Two failing sewage pumps at the city-owned childcare building need about $40,000 in replacement. The Council transferred the money from parks contingency so the regional childcare provider can stay open safely.
Wayfinding for locating names on the memorial
Finding a specific name on the memorial wall is hard, and the committee wants a system to help. Scott McMullen is researching options, and a high school student might catalogue the engravings as a Senior Project.